2004-09-02 Installation of the probes 1.jpg
2004-09-02 Installation of the probes 2.jpg
2004-09-02 Preparing the teflon-quartz soil water samplers.jpg
2004-09-02 Teflon-quartz soil water samplers.jpg
2005-05-12 Control of TDR measurements.jpg
2005-05-12 Installation of TDR.jpg
2005-05-12 TDR control box.jpg